The GTM Supercar Build Log

Skid System, Wiring Loom, Hard-lines Attached

Since I am stumped on the engine/throttle issue I started on installing the skid system. This will protect the underbody of the car, as well as the actual body, from speed bumps, ramps, etc. Each skid bar (8 in all) is attached to the frame using tapped 10-32 holes. The process is painstaking, but the end result is worth it.  I attached the front four skid bars tonight and will tackle the rest once the engine is running properly and no leaks are found.

After working on the skid system I loomed up the oil pump wiring, and attached the hard coolant lines to the frame.

Leave a Reply

You must be logged in to post a comment.