The GTM Supercar Build Log

Gas Pedal Installed

First thing today was the gas pedal. My crappy rivnut tool finally bit the dust while trying to do the first of two rivnuts to mount the pedal. I was pretty discouraged so I decided to move on to the e-brake install. While looking for the e-brake mounting bolts in one of the many boxes that came with the kit I found another unlabeled brown box. I had to open it to see what it was and lo and behold it was a Marson Thread Setter rivnut tool. The same one I was planning on buying online tonight. It was not even on my inventory sheet, so I had no idea it came with the kit. Needless to say it did the job quickly and I no longer dread rivnuts.

Leave a Reply

You must be logged in to post a comment.